Description
Double Handle Long Lead
* Double Handle for Extra Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo tdouble handle long lead is made from tightly woven nylon with interwoven rubber for extra grip and control.
A longer length lead to give your dog more freedom to explore and use their senses.
1.8M x 15mm













