Sports Training Long Lead - Reflective

Perfect for training or a more freedom to roam walk!!
Manufacturer: Hem and Boo
*
£20.00

* Recall and Distance Control
* Durable and Strong
* Reflective for Safety 

 The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.

Coordinate the training long lead with the sports harness and collar.

3 Lengths

5M x 25mm
10M x 25mm
15M x 25mm

Product tags